PROJECT PORTFOLIO

  • All
  • Hatcheries & Hydroelectric
  • Miscellaneous
  • Pump Stations
  • Roads & Civil
  • Water/Wastewater Treatment

Vaughn Elementary Fire Pump Replacement

Vaughn, Washington

 

 

Project Manager: Tyler Irwin

Superintendent: Lorres Golbienko

Owner: Vaughn School District

Project Start: July 2020

Job Description:

Project includes the full removal and wastehaul of an existing fire pump and diesel engine and replacement with a new pump and engine.


Yodelin Creek Bridge

Leavenworth, Washington

 

 

Project Manager: Tyler Irwin

Superintendent: Craig Conrad

Contract Amount: $958,569.00

Owner: Chelan County Public Works Department

Engineer: Chelan County

Project Start: August 2019

Project Completion: October 2019

Job Description: Contract provides for the improvement of the Yodelin Creek Bridge Project, by constructing roadway excavation including haul, channel excavation, common borrow incl. haul, structure excavation, concrete class 4000 for bridge, steel reinforcement bar, pre-stressed concrete girder W35DG, waterproof membrane, cast-in-place concrete barrier, bridge railing, utility relocation, crushed surfacing, HMA Class 1/2In. PG64-28.


Coupeville Water Supply Improvements

Coupeville, Washington

 

 

Project Manager: Dean Irwin & Tyler Irwin

Superintendent: Jess Phillips

Contract Amount: $4,608,168.19

Owner: U.S. Navy

Engineer: APTIM & Jacobs (CH2M Hill)

Project Start: February 18, 2019

Project Completion: May 2020

Job Description: The Work will provide the Owner with a Granular Activated Carbon (GAC) treatment system to maintain PFOA and PFOS concentrations below the USEPA 70 ppt LHA level, and extend the Owner’s distribution system to provide municipal drinking water to residences whose private supply wells have been impacted.


Lakota WWTP Turbo Blowers Installation & UpgradeLa

Federal Way, Washington

 

 

Project Manager: Tyler Irwin

Superintendent: Lorres Golbienko

Contract Amount: $1,134,272.40

Owner: Lakehaven Water & Sewer District

Engineer: BHC Consultants

Project Start: March 2019

Project Completion: October 2019

Job Description: Proposed work consists of all labor, materials and equipment necessary for installation of Owner-furnished blower equipment at the Lakota Wastewater Treatment Plant.


City of Huntington Wastewater System Improvements

Huntington, Oregon

 

 

Project Manager: Tyler Irwin

Superintendent: Jess Phillips, Lorres Golbienko, Josh Johnson

Contract Amount: $3,194,655.23

Owner: City of Huntington

Engineer: 

Project Start: July 23rd, 2018

Project Completion: August 2019

Job Description: Project consists of construction of a brand new wastewater treatment facility including: new headworks, package treatment utilizing integrated fixed film activated sludge unit process, ultraviolet light disinfection, flow monitoring, sludge storage ponds and site improvements.


Eagle Creek National Fish Hatchery: Adult Holding Pond Rehabilitation Project

Estacada, Oregon

 

 

Project Manager: Tyler Irwin

Superintendent: Josh Johnson

Contract Amount: $886,265

Owner: U.S. Fish and Wildlife Service

Engineer: McMillen Jacobs Associates

Project Start: Spring 2018

Project Completion: 170 Calendar Days

Job Description: Construction consists of rehabilitating the existing adult fish holding pond and fish ladder at the Eagle Creek National Fish Hatchery.


Grants Pass Water Restoration Plant Phase 2 Upgrade Project

Grants Pass, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $23,500,000

Owner: City of Grants Pass

Engineer: CH2M Hill

Project Start: August 7th, 2017

Project Completion: March 2019

Job Description: Design/Build construction to include: seismic upgrades and modifications to existing Operations Buildings, new Odor Control facility and mechanical system, modifications to existing headworks structural, process equipment and mechanical systems, reconstruction of the de-gritter basin, construction of a new concrete clarifier and installation of process equipment, new aeration basin diffuser system, new blower building & equipment, new truck unloading facility and upgrades of all plant electrical and I&C systems.


Wilkeson Creek Hatchery

Buckley, Washington

 

 

Project Manager: Erik Golub

Superintendent: Craig Conrad, Josh Johnson

Contract Amount: $1,332,130

Owner: Puyallup Tribe of Indians

Engineer: Fisheries Engineers, Inc.

Project Start: June 1st, 2017

Project Completion: October, 2017

Job Description: Construction of a new salmon hatchery in Buckley, Washington.  Major elements of the proposed work are a water supply system for the new hatchery, and four large ponds for rearing juvenile salmon.


Chemical Waste Landfill Thermal Treatment System Improvements

Arlington, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad, Jess Phillips

Contract Amount: $4,822,983

Owner: Waste Management, Inc.

Engineer: CH2M Hill

Project Start: February 1st, 2016

Project Completion: September 30th, 2017

Job Description: New Weather Protection Structure and Hopper Basin. Containment basins for Treatment System and Tank Yard. Support Steel Structures for Conveyors in Building B-4 and Pipe/Cable Support Rack Structures in Treatment Basin and Tank Yard. Foundations for Vendor-furnished Conveyor Support Structures. Installation and anchorage of Owner-furnished Vendor equipment and support structures. Installation of all Owner-furnished Vendor equipment, platforms and structural elements per Owner-furnished, Vendor design documents. Provide anchorage design and installation of all Owner-furnished, Vendor-designed structural elements including conveyor supports and tank platforms.


Rotary Fine Screen Installation

Sultan, Washington

 

 

Project Manager: Tyler Irwin

Superintendent: Lorres Golbienko

Contract Amount: $80,509

Owner: City of Sultan

Engineer: City of Sultan

Job Description: Replace existing rotary fine screen and replace with new equipment from Treatment Equipment Company (TEC).


Phase 2 CSO Project

Port Angeles, Washington

 

 

Project Manager: Dean Irwin, Tyler Irwin

Superintendent: Jess Phillips

Contract Amount: $ 15,198,782

Owner: City of Port Angeles

Engineer: Brown & Caldwell

Project Start: February 2nd, 2015

Project Completion: October 31st, 2016

Job Description: Replacement of Pump Station 4 with a new station, construction of a gravity diversion sewer (Front Street Diversion Sewer) to convey flow directly from the location of CSO 008 to the new pump station, completion of force mains partially constructed in Phase 1, and a new 42 inch influent sewer to divert flows from the existing Pump Station 4 to the replacement at a location directly across Marine Driver. A new storm drain from the new pump station location along Front Street to Oak (approximately 1000 feet) including catch basins, a new water treatment component and outfall on the shoreline.


Sandy Point Wastewater Treatment Facility Improvements

Ferndale, Washington

 

 

Project Manager: Tyler Irwin

Superintendent: Lorres Golbienko

Contract Amount: $4,126,832

Owner: Lummi Nation Planning & Public Works Department

Engineer: Gray & Osborne, Inc.

Project Start: March, 26th, 2014

Project Completion: June 18th, 2015

Job Description: The work consisted of furnishing all labor, materials, and equipment necessary to replace existing primary and secondary clarifier mechanisms and associated piping, installation of two banks of UV disinfection units and associated piping, new aeration blowers and site piping and installation of a new backup generator. Construction included site clearing and renovation, repaving and installation of blacktop on the plant’s access road, and all new sidewalks throughout the site.


Phillips 66 Crude Unloading Facility

Ferndale, Washington

 

 

Project Manager: Dean Irwin, Tyler Irwin

Superintendent: Craig Conrad

Contract Amount: Undisclosed

Owner: Phillips 66

Engineer: CH2M Hill

Project Start: March 1st, 2014

Project Completion: September 30th, 2014

Job Description: The overall project included constructing a new railway, unloading terminal, supporting facilities and buildings. The work included concrete foundations, installation of precast trench, a pump station and 1,630 LF of concrete slab.


Muckleshoot Keta/Crisp Creek Hatchery

Auburn, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $12,296,521

Owner: Muckleshoot Indian Tribe

Engineer: MWH Americas

Project Start: June 25th, 2014

Project Completion: October 31st, 2015

Job Description: Construction of facilities designed under the design phase of this project, including the following items: Crisp Creek Site: Expansion of pumping ability from 2.5cfs to 8cfs minimum, addition of filtration facilities to facilitate re-use and surmount the water shortage problem, new hatchery building with appurtenant equipment, fish rearing tanks, sediment trap and cyclone filter system, relocate and upgrade rearing ponds with oxygenation and effluent filtration, bypass structure in Crisp Creek, clarifier, demo two existing pole sheds and replacement storage building, monitoring and alarm system to monitor changes in facility water, temperature, and oxygen levels, addition of CCTV security system and all perimeter fencing and paving. Keta Facility: Additional pumps to increase current 2.5cfs to 8cfs, cyclone filers, ammonia filtration of water moving from Crisp Creek facility to Keta facility, capping of springs to improve capture rate (including re-piping to facilities served), update existing sediment management system, upgrade hatchery building equipment to support added incubation, upgrade facility to current code for handling of formalin, oxygen injection system, new off channel adult holding facility, new feed storage building, upgrade existing residence at north end of property and add another residence, monitoring and alarm system to monitor changes in facility water, temperature and oxygen levels, addition of CCTV security system at the facility, and all perimeter fencing and paving.


Rock Creek AWWTF - Tertiary Treatment Project

Hillsboro, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad, Lorres Golbienko

Contract Amount: $12,926,521

Owner: Cleanwater Services

Engineer: Carollo

Project Start: April 10th, 2012

Project Completion:  December 2013

Job Description: Construct a secondary diversin box to control split of flow of secondary effluent between chlorine contact basins 1 and 2 and the new high rate clarification facility. Installed yard piping to convey secondary effluent and primary effluent bypass flows to the high rate clarification facility. Constructed two high rate clarification systems including concrete tanks, mixers, scrapers, chemical feed systems, a new electrical room and pump station, and a tertiary effluent pump station.


Turner Creek Intake Improvements

Yamhill, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Jeff Rasch, Craig Conrad

Contract Amount: $248,346

Owner: City of Yamhill

Engineer: Firwood Design Group, LLC

Project Start: July 1st, 2011

Project Completion:  October 1st, 2011

Job Description: Furnish, install and remove temporary coffer dam diversion and temporary erosion control measures; remove vegetation within project limits; excavate 160 cy of earthen material and removal of basalt rock formations. Construct new concrete intake, sediment basin structure and wet well structure; install PVC waterline, access stairs, catwalk and safety railing. Installation of new fish screen, submersible pumps, VFDs, security system and other I&C components.


Temporary Biosolids Dewatering Project

Oregon City, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $2,083,900

Owner: Tri-City Service District

Engineer: CH2M Hill

Project Start: April 14th, 2011

Project Completion:  270 Calendar Days

Job Description: Construction of a temporary bio-solids dewatering system, including a skid mounted centrifuge package system.


Young's Creek Hydroelectric Project

Sultan, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $10,026,951

Owner: Snohomish County PUD #1

Engineer: EES Consulting

Project Start: February 2nd, 2010

Project Completion: 425 Calendar Days

Job Description: Construct a dam, intake and powerhouse, switchyard and installation of district-supplied equipment and penstock pipe, and start-up and testing.


WWTP Basin #2 Modifications

Richland, Washington

 

 

Project Manager: Will Scott

Superintendent: Bruce Wilson

Contract Amount: $2,538,315

Owner: City of Richland

Engineer: Brown & Caldwell

Project Start: December 1st, 2009

Project Completion:  225 Working Days

Job Description: Construction of an anoxic selector, construction of baffles and installation of fine-bubble diffusers. Installation of a high-speed turbo blower, with associated electrical and control modifications. Construction of a selector bypass system, rerouted secondary scum piping and modifications to existing control system panels.


Building Seismic Wall Improvements Project

Clackamas, Oregon

 

 

Project Manager: Will Scott

Superintendent: Kip Smith

Contract Amount: $914,921

Owner: Clackamas River Water District

Engineer: West Yost & Associates

Job Description: Schedule A: Demolition of designated existing exterior treatment plant building walls. Installation of seismic shear and buttress walls and related connections to existing building walls. Mechanical, plumbing and electrical facilities removal and renovation in conjunction with seismic upgrades. Pavement repair, grading and other miscellaneous work needed to restore areas disturbed by the construction back to original condition. Schedule C: Demolition of an existing caustic scrubber system and installation of a new sodium hypochlorite facility.


Membrane Bioreactor Wastewater Treatment Plant

Bellevue, Idaho

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad, Steve Landis

Contract Amount: $4,668,000

Owner: City of Bellevue

Engineer: Keller Associates

Project Start: October 9th, 2008

Project Completion:  480 Calendar Days

Job Description: Construction of a new mechanical membrane bioreactor wastewater treatment facility. Construction included concrete process basins, concrete and masonry wall, pre-engineered steel building, installation of membrane bioreactor (MBR) equipment, mixing, aeration and pumping equipment and all associated piping, electrical systems and site work.


Water Reclamation Facility

Warden, Washington

 

 

Project Manager: Will Scott

Superintendent: Kip Smith

Contract Amount: $9,278,114

Owner: City of Warden

Engineer: Gray & Osborne, Inc.

Project Start: February 12th, 2008

Project Completion: 425 Working Days

Job Description: Construction of a water reclamation facility at the existing wastewater treatment plant, consisting of two lift stations, headworks, oxidation ditch, two clarifiers, operations building, disk filtration system, polymer feed system, UV disinfection system, sludge holding tank, sludge drying beds and recharge basins.


SWWTP Upgrade & NWWTP Sludge Drying Beds

Madras, Oregon

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $3,243,475

Owner: City of Madras Public Works

Engineer: ACE Consultants, Inc.

Project Start: August 28th, 2007

Project Completion: 378 Calendar Days

Job Description: Construction of a sequencing batch reactor, an aerobic digester, a sludge holding tank, chemical feed systems, electrical and instrumentation & control systems at the Madras South Wastewater Treatment Plant. Construction of sludge drying beds at the Madras North Wastewater Treatment Plant.


Rock Creek Facility Phase 6D: Secondary Clarifier #10

Hillsboro, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $4,783,333

Owner: Cleanwater Services

Engineer: CH2M Hill

Project Start: May 1st, 2007

Project Completion: 550 Calendar Days

Job Description: Construction of Secondary Clarifier #10 (1 million gallon) including RAS & WAS pumping systems, influent mixed liquid aeration, sampling, scum removal, alum & lime feed lines. Demo civil, structural, mechanical & electrical elements. Furnish & install related equipment, piping, fabricated metal work, painting, electrical and instrumentation & control.


Wastewater Treatment Plant Improvements

Molalla, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $2,868,994

Owner: City of Molalla

Engineer: Tetra Tech / KCM

Project Start: February 28th, 2007

Project Completion: 215 Calendar Days

Job Description: Wastewater treatment plant improvements including: disolved air flotation (DAF) addition; rapid sand filtration system; chemical feed system; modifications to the existing treatment system; retrofit of the existing DAF system; and abandonment of the existing filtration system.


Chacarun Reservoir Seismic Retrofit Phase II

Salem, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $571,800

Owner: City of Salem

Engineer: Black & Veatch Corporation

Project Start: December 14th, 2006

Project Completion: May 1st, 2007

Job Description: Seismic rehabilitation of Chacarun Reservoir – a concrete, pre-stressed circular tank. Work consisted of structural, piping and electrical improvements. Structural improvements included the repair of spalling concrete and securing the roof. Piping included flexible expansion joints, a seismic-actuated valve with sensor, valve vault and associated connections.


Corridor Well Facility Construction

Milton, Washington

 

 

Project Manager: Will Scott

Superintendent: Bobby Brillowsky

Contract Amount: $1,146,454

Owner: City of Milton

Engineer: Gray & Osborne, Inc.

Project Start: December 5th, 2006

Project Completion: 150 Calendar Days

Job Description: Construction of a 42′ x  12′ timber-framed well building. Equipment included installation of a vertical turbine pump, submersible pumps, booster pumps, flow meter, control valves, aeration tower, sodium hypochlorite feed system, electrical and telemetry systems. Work also included site improvements, grading, paving and storm drainage.


Industrial Wastewater Treatment Facilities Headworks Improvements Project

Sunnyside, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $908,539

Owner: Port of Sunnyside

Engineer: Carollo Engineers

Project Start: October 24th, 2006

Project Completion: 250 Calendar Days

Job Description: Work included temporary bypass of existing headworks facility, temporary transfer of existing pumps to upgraded basin, purchase and installation of new pumping equipment. Construction of flume structure, electrical work and yard piping.


Wastewater Treatment Plant Upgrade

Bainbridge Island, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $828,000

Owner: Kitsap County Sewer District No. 7

Engineer: Yuhl & Associates

Project Start: June 8th, 2006

Job Description: Wastewater treatment upgrade with aeration basin including all concrete, piping and appurtenances.


Mountain View Reservoir #2 & Pump Station

Oregon City, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $5,126,878

Owner: City of Oregon City

Engineer: Black & Veatch Corporation

Project Start: June 7th, 2006

Project Completion: August 1st, 2007

Job Description: Seismic upgrade of existing concrete water tank. COnstruction of new 8000 GPM capacity pump station with three horizontal split case centrifugal VFD pumps with and emergency generator. Associated water piping of 1055 LF of 6″ – 24″ diameter water piping, fittings, valves & appurtenances. 66,000 SF roof replacement on original water tank and demolition of a 100,000 gallon elevated steel water tank.


Wastewater Pump Station

Sutherlin, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $476,000

Owner: City of Sutherlin

Engineer: BTS Engineering & Survey, Inc.

Project Start: April 3rd, 2006

Project Completion: 120 Calendar Days

Job Description: Construction of a 1400 GPM pump station, wet well, electrical panels and monitoring equipment. Included utilities, stand-by generator, CMU building, sitework and new fence.


Hazel Dell Pump Station

Vancouver, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $2,986,025

Owner: Hazel Dell Sewer District

Engineer: CH2M Hill, Brown & Caldwell

Project Start: July 26th, 2005

Project Completion: 180 Calendar Days

Job Description: Schedule A: Improvements to the existing 36th Avenue pump station included new sheet pile flood protection wall, diesel engine-driven sewage pumps, biofilter odor control system and site improvements. Schedule B: Replacement of existing system at Salmon Creek WWTP with new cast-in-place reinforced concrete sludge blend tank with embedded plastic liner, sludge mixing system and biotower odor control system.


Sludge Lagoon #3

Medford, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $1,543,000

Owner: City of Medford

Engineer: Carollo Engineers

Project Start: May 27th, 2005

Project Completion: 180 Calendar Days

Job Description: Renovation of an earthen sludge lagoon, including installation of a polyethylene liner, earthwork, paving, process piping, concrete pumping structures and a booster pump station.


Chambers Creek WWTP - Fertilizer Manufacturing Facility

University Place, Washington

 

 

Project Manager: Will Scott

Superintendent: Kip Smith

Contract Amount: $5,811,522

Owner: Pierce County Public Works

Engineer: Brown & Caldwell

Project Start: June 30th, 2004

Job Description: Construction of a new fertilizer manufacturing facility that included concrete, masonry, steel structure and metal wall panels. Installation of Owner-furnished equipment and piping, and integration of facility into the treatment plant process.


Wastewater Treatment Plant Improvements

Shady Cove, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $3,969,000

Owner: City of Shady Cove

Engineer: Carollo Engineers

Project Start: July 15th, 2004

Project Completion: 365 Calendar Days

Job Description: Retrofit and upgrade of the existing WWTP to 2.0 MGD capacity. Demolish existing influent pump station and construct new. Install new cylindrical fine screen, structural and mechanical improvements to the existing aeration basins/aerobic digester tank and aeration air conveyance system. Conversion of aeration basins and digesters to fine bubble diffusers, new 50′ diameter secondary clarifier, new RAS/WAS pump station, new tertiary filter basin and package filter equipment.


Highland Concrete Reservoirs & Pump Station

Okanogan, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $1,135,064

Owner: City of Okanogan

Engineer: Gray & Osborne, Inc.

Project Start: May 28th, 2004

Project Completion: 180 Calendar Days

Job Description: Construction of a 200,000 gallon concrete reservoir, a 200,000 gallon partially-buried concrete reservoir, booster pump station  and transfer station. Installation of approximately 2,300 lineal feet of 8-inch PVC and 1,550 lineal feet of 12-inch PVC water mains.


Industrial Wastewater Treatment Facilities

Sunnyside, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $6,095,804

Owner: Port of Sunnyside

Engineer: Earth Tech, Inc.

Project Start: January 30th, 2004

Project Completion: 300 Calendar Days

Job Description: Phase 1 Sequencing Batch Reactor (SBR) treatment facility to include: two circumferential wrapped, pre-stressed concrete SBR tanks; a reinforced concrete sludge storage tank, a reinforced concrete flow equalization tank, an SBR process system, pump, piping and other process and ancillary equipment.


Deer Creek Water Plant Reservoir Modification

Woodway, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $176,588

Owner: Olympic View Water & Sewer District

Engineer: Penhallegon Associates (PACE)

Project Start: January 20th, 2004

Project Completion: 141 Calendar Days

Job Description: Construction and installation of a 90′ x 60′ steel structure over existing sediment pond. Included 13ea 6′ deep, 18″ diameter augercast piling.


Cascade Well #3 Pump

Portland, Oregon

 

 

Project Manager: Will Scott

Superintendent: Craig Conrad

Contract Amount: $1,223,100

Owner: Rockwood Water PUD

Engineer: Hydra Engineering

 

 

Project Start: December 23rd, 2003

Project Completion: 120 Calendar Days

Job Description: Installation of a new well pump, booster pumps, chemical treatment facilities and control systems.

 


Fish Screen Replacement, Intake Modification and Bank Protection Project

Ferndale, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $2,036,447

Owner: PUD #1 of Whatcom County

Engineer: Montgomery Watson Harza (MWH)

Project Start: April 22nd, 2003

Project Completion: 132 Working Days

Job Description: Demolition of the existing river intake screen structure at Plant No. 1. Furnish and install new Endangered Species Act (ESA) compliant intake fish screen structure complete with pumps and backwash equipment. Construction included expansion to the existing river intake structure.


Well Field and Water Treatment Plant

Florence, Oregon

 

 

Project Manager: Will Scott

Superintendent: Craig Conrad

Contract Amount: $2,488,083

Owner: City of Florence

Engineer: Brown & Caldwell, Inc.

Project Start: February 3rd, 2003

Project Completion: December 31st, 2003

Job Description: Work included addition of 5 new wells, raw water pipelines and expansion of the water treatment plant to handle 3.0 MGD.


Water Filtration Facility

Coulee Dam, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis, Kip Smith

Contract Amount: $4,628,091

Owner: Town of Coulee Dam

Engineer: Gray & Osborne, Inc.

Project Start: September 25th, 2002

Project Completion: 360 Calendar Days

Job Description: Construction included site work, retaining wall, concrete work, and cast in place concrete filter building. CMU operations building, concrete clearwell, concrete detention basin, yard piping, electrical and I&C. Work also included piping across the Columbia River Bridge, modifications to the West Side Reservoir and new raw water pumps at Grand Coulee Dam.


Well Water Pump Station & Concrete Reservoirs

Hamilton, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $734,500

Owner: Town of Hamilton

Engineer: EES, Inc.

Project Start: August 1st, 2002

Job Description: Construction of a new well water pumping and treatment station, two above-ground storage tanks and all site work, piping and facilities.


Wastewater Treatment Facilities Improvements

McNeil Island Correction Center - Steilacoom, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $1,649,900

Owner/Engineer: State of Washington Department of Corrections

Project Start: June 21st, 2002

Project Completion: 320 Calendar Days

Job Description: Construction of headworks, auger screen, influent pumps, modifications to existing SBR basins, air diffuser system, new secondary clarifiers, flow meters and modifications to the scum pump station. New UV system, rotary screw press and associated piping and electrical.


Clearview Pump Station

Snohomish, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Kip Smith

Contract Amount: $616,548

Owner: Cross Valley Water District

Engineer: Penhallegon Associates

Project Start: June 18th, 2002

Project Completion: 120 Calendar Days

Job Description: Construct a CMU building with metal roof to house new pumps and miscellaneous appurtenances on the existing Clearview Standpipe site.


Miller/Salmon Creeks Wastewater Treatment Plant Improvements

Normandy Park, Washington

 

 

Project Manager: Will Scott

Superintendent: Craig Conrad

Contract Amount: $824,760

Owner: Southwest Suburban Sewer District

Engineer: CHS Engineers, Inc.

Job Description: Miller Creek WWTP and Salmon Creek WWTP: Demolition of existing headworks bar screens and installation of step fine screens and screenings wash press. Miller Creek WWTP: Demolition of existing grit removal equipment and concrete grit channels and installation of circular grit removal chambers, grit removal equipment and a grit washer/classifier. Installation of air blowers. Installation of RBC equipment in an existing basin. Repair of corrosion-damaged concrete surfaces and manhole. Modification of existing odor control air piping.


Greywolf Veterinary Hospital

Sequim, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $163,844

Owner: Suzanne and Mike C Taylor

Project Start: May 7th, 2002

Project Completion: July 22nd, 2002

Job Description: Construction included taking a vacant site and installing sanitary sewer lines, water lines, a storm drainage system, site grading, HMA paving, curbing and striping in preparation for a new veterinary hospital.


Stables Creek Culvert Replacement

Everett, Washington

 

 

Project Manager: Steve Renner

Contract Amount: $69,936

Owner/Engineer: City of Everett

Project Start: September 10th, 2001

Project Completion: 14 Calendar Days

Job Description: Remove existing culvert and install 88 LF of new 9′ aluminum arch frame culvert with gravel spawning bed.


Water Filtration Facility Portal #4 Modifications Project

Everett, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Renner

Contract Amount: $1,036,684

Owner/Engineer: City of Everett

Project Start: June 13th, 2001

Project Completion: December 31, 2002

Job Description: Construct/Install 3 miles of medium voltage power supply. Demolish and reconstruct a portal building and install various piping appurtenances.


Eagle Creek Hatchery Phase I - Areas 1 & 3

Estacada, Oregon

 

 

Project Manager: Will Scott

Superintendent: Mark Lewis

Contract Amount: $289,000

Owner: US Fish & Wildlife Service

Engineer: Harza Engineering

Project Start: September 6th, 2001

Project Completion: October 1st, 2001

Job Description: Remove and replace existing AC pavement. Install new storm drainage system. Miscellaneous electrical improvements.


Westside Interceptor Pump Station

Lebanon, Oregon

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $1,449,000

Owner: City of Lebanon

Engineer: West Yost & Associates

Project Start: May 23rd, 2001

Project Completion: March 18th, 2002

Job Description: Construction of a new deep well wastewater pump station and installation of standby generator. Work included new concrete pump station, force man and meter vault, drainage pump station, earthwork and paving. Demolition of existing standby power systems and associated electrical/instrumentation.


Little White Salmon Raceway Water Lines

Cook, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $38,473

Owner: US Fish & Wildlife Service

Engineer: Harza Engineering

Project Start: April 17th, 2001

Project Completion: December 31st, 2001

Job Description: Install 2,070 LF of 24″ domestic water line.


Kingston Skate Park

Kingston, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Mark Lewis

Contract Amount: $195,600

Owner: Kitsap County

Engineer: Macleod Reckord

Project Start: March 9th, 2001

Project Completion: 75 Working Days

Job Description: Construction of a new skatepark, including surveying, earthwork, storm drains, curbs and parking lot. Concrete skate features included sloped, curved inclines and flat work.


Foss Earthquake Repair

Seattle, Washington

 

 

Project Manager: Dean Irwin

Contract Amount: $216,540

Owner: Foss Maritime Shipyard

Project Start: March 1st, 2001

Job Description: Remove and dispose damaged asphalt paving. Import and placement of structural fill. New gravity storm drain system at dry dock. New HMA pavement.


Little White Salmon & Willard National Fish Hatcheries: Dam and Intake Repairs

Bingen, Washington

 

 

Project Manager: Will Scott

Superintendent: Craig Conrad

Contract Amount: $432,208

Owner/Engineer: US Fish & Wildlife Service

Project Start: December 21st, 2000

Project Completion: 120 Calendar Days

Job Description: Repair and modification of the Little White Salmon NFH Intake Diversion Dam including:: construct a new headwall and sluice gate in the existing sluiceway, construct a concrete cutoff wall at the tow of the dam and surface patch of the existing dam face. Construction included repair and modification to the Willard NFH Diversion Dame and Intake and includes: demolition of the existing rock and concrete diversion dam, construction of a concrete sediment sluiceway with sluice gate and replacement of the existing trash rack.


Little White Salmon National Fish Hatchery: Raceways Replacement

Cook, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis

Contract Amount: $2,766,596

Owner: US Fish & Wildlife Service

Engineer: Harza Engineering

Project Start: February 19th, 2001

Project Completion: May 15th, 2002

Job Description: Construction of 22ea 10′ x 110′ cast-in-place concrete raceways including, demolition, sitework, fencing, piping, drainage and electrical.


Route 36 Trolley Extension

Seattle, Washington

 

 

Project Manager: Steve Renner

Contract Amount: $422,000

Owner/Engineer: King County Department of Transportation

Project Start: August 14th, 2000

Project Completion: March 14th, 2001

Job Description: Erection of two new substation buildings, one at the refurbished Maple Street site and a new substation at Webster Street. Construction at both sites included earthwork, foundations, walls, doors, fencing, driveways, storm drainage, utility relocation and landscaping.


Water Treatment Plant Seismic & Building Code Upgrades

West Linn, Oregon

 

 

Project Manager: Will Scott

Superintendent: Mark Lewis

Contract Amount: $369,965

Owner: City of Lake Oswego

Engineer: EQE International, Inc.

Project Start: June 8th, 2000

Project Completion: October 15th, 2000

Job Description: Construction of seismic and building code upgrades at the Lake Oswego Water Treatment Plant including: shear transfer brackets, shotcrete and concrete shear walls, equipment and mechanical systems bracing, fire suppression sprinkler system, demolition of existing plant systems, ADA improvements, stair and restroom upgrades.


Makah Fish Hatchery: Adult Fish Spawning Facility Renovations

Neah Bay, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $2,027,339

Owner: US Fish & Wildlife Service

Engineer: Harza Engineering

Project Start: April 25th, 2000

Project Completion: 385 Calendar Days

Job Description: Construction of an adult fish handling facility including a 65′ x 124′ pre-engineered metal building, spawning area, concrete pond modifications, concrete recovery pond, mechanical crowders, pescalator, spawning equipment, fish transportation piping and electrical system.


Estacada Water System Improvements

Estacada, Oregon

 

 

Project Manager: Will Scott

Superintendent: Craig Conrad

Contract Amount: $2,141,613

Owner: City of Estacada

Engineer: TetraTech/KCM, Inc.

Project Start: June 14th, 2000

Project Completion: 400 Calendar Days

Job Description: Modification and expansion of the raw water intake pump station, water treatment plant, clearwell and high-level pump station from 1 MGD to 2 MGD.


Service Pump Installation

Ferndale, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Renner

Contract Amount: $68,200

Owner: City of Ferndale

Engineer: Reichhardt & Ebe Engineering, Inc.

Project Start: February 25th, 2000

Project Completion: 80 Working Days

Job Description: Provide and install a No. 3 High Head Pump at the Ferndale Water Treatment Plant. The pump is to be rated for 3200 GPM at 320 feet of head and is to be driven by a 300 HP electric motor. Work included water piping, valves, motor controls and associated wiring.


Koss Residence

Hunts Point, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Craig Conrad

Contract Amount: $400,000

Engineer: Krekow Jennings, Inc.

Project Start: November 11th, 1999

Job Description: Construction consisted of building a structural concrete foundation. Project consisted of form/pour/strip/finish 600cy of steel reinforced cast-in-place concrete.


Foss Storm Drain Improvements

Seattle, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Renner

Contract Amount: $313,644

Owner: Foss Maritime Shipyard

Engineer: Berger/Abam Engineers, Inc.

Project Start: September 9th, 1999

Project Completion: 40 Working Days

Job Description: New storm drain system including 1200 lineal feet of gravity sewer pipe and deep well pump station. Auger-cast piling and concrete foundation for twin storm water holding tanks.


Microgas Solids To Ash Project

Renton, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Renner

Contract Amount: $128,689

Owner: City of Renton, Microgas Corporation

Engineer: Earth Tech, Inc.

Project Start: August 15th, 1999

Project Completion: 60 Calendar Days

Job Description: Concrete foundation and installation of a 20′ x 35′ metal stud steel building. Project included installation of gas piping and microwave equipment.


Vista House

Mercer Island, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $493,602 

Engineer: Krekow Jennings, Inc.

Project Start: August 4th, 1999

Job Description: Structural concrete foundation to include 735 CY of cast-in-place concrete.


Sequim Skate Park

Sequim, Washington

 

 

Project Manager: Dean Irwin

Superintendent: Steve Landis

Contract Amount: $223,909

Owner: City of Sequim

Engineer: Gray & Osborne, Inc.

Project Start: June 28th, 1999

Project Completion: 45 Working Days

Job Description: Construct a concrete skate park including; clearing, earthwork and 400 cubic yards of reinforced concrete structures.


Interim Waste Activated Sludge Improvements Project

Longview, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Renner

Contract Amount: $1,887,145

Owner: Cowlitz County Department of Public Works

Engineer: ACE Consultants

Project Start: April 27th, 1999

Project Completion: 240 Calendar Days

Job Description: Construct a sludge thickening facility to include: two gravity belt thickeners, thickened sludge pumping systems and polymer dilution units inside a prefabricated metal building. Thickened sludge storage facility with two storage tanks and pumping facilities installed within a prefabricated metal building. Modifications to existing pumping and piping systems. Construction of electrical power and control systems. Paving and drainage.


Boundary Bay Concrete Deck Addition

Bellingham, Washington

 

 

Project Manager: Dean Irwin

Contract Amount: $40,862

Owner: Boundary Bay Brewing Company

Project Start: 1999


UV Equipment Installation

Lynden, Washington

 

 

Project Manager: Dean Irwin

Contract Amount: $26,154

Owner/Engineer: City of Lynden

Project Start: 1999

 


Lynden WWTP Equipment Repair

Lynden, Washington

 

 

Project Manager: Dean Irwin

Contract Amount: $14,632

Owner/Engineer: City of Lynden

Project Start: Fall 1998

 


Shoreline Lift Stations 4, 6 & 11

Shoreline, Washington

 

 

Project Manager: Will Scott

Superintendent: Steve Landis & Mark Lewis

Contract Amount: $615,069

Owner: Shoreline Wastewater Management District

Engineer: CHS Engineers, Inc.

Project Start: December 1st, 1998

Project Completion: 360 Calendar Days

Job Description: 

  1. Lift Station #4 – Construction of standby generator system, replacement of pumps, piping HVAC and electrical
  2. Lift Station #6 – Directional drilling, replacement of pumps, piping and electrical.
  3. Lift Station #11 – Demolition and replacement of existing pump station including new wet well, pre-packaged dry well, pumps, piping and electrical.

Euclid Lift Station

Bellingham, Washingtion

 

 

Project Manager: Dean Irwin

Superintendent: Steve Renner

Contract Amount: $91,184

Owner: Whatcom County Water District #10

Engineer: Wilson Engineering

Project Start: October 19th, 1998

Project Completion: 90 Calendar Days

Job Description: Project included temporary sewage bypass pumping and installation of new sewage pumps, modifications to the wet well and new discharge piping. New manual transfer switch for portable generator and new electrical & control.


Sudden Valley Sewage Detention Basin

Bellingham, Washington

 

 

Project Manager:  Dean Irwin

Superintendent:  Steve Renner

Contract Amount: $828,614

Owner: Whatcom County Water District #10

Engineer: Wilson Engineering

Project Start: October 19th, 1998

Project Completion: 120 Working Days

Job Description: Construction of a new underground 710,000 reinforced concrete sewage detention tank. Project included new electric and telemetry controls, 8″ pressure sewer line and extended water service lines.


Kitsap Pump Stations 1 & 19

Bremerton, Washington

 

 

Project Manager: Will Scott

Contract Amount: $99,398

Owner: Kitsap County Department of Public Works

Engineer: Parametrix, Inc.

Project Start: December 7th, 1998

Project Completion: 180 Calendar Days

Job Description: Demolition and replacement of 50 HP pumps and piping at the two existing lift stations and replacing each with 100 HP pumps.


Lynden WWTP Jet Aerator Installation

Lynden, Washington

 

 

Project Manager: Steve Renner

Contract Amount: $8,400

Owner: City of Lynden

Engineer: EarthTech

Project Start: September 28th, 1998

Project Completion: 15 Working Days

Job Description: Remove the two existing and install two new owner-furnished jet aerators.


Pacific Marine Concrete Foundation

Tacoma, Washington

 

 

Project Manager: Will Scott

Superintendent: Don VanSickle

Contract Amount: $397,752

Owner: Charter Construction

Project Start: July 24th, 1998

Project Completion: 120 Calendar Days

Job Description: Form, pour, finish concrete crane rail beds.


Well No. 14 Pump Station Project

Bremerton, Washington

 

 

Project Manager: Will Scott

Superintendent: Ernie Proffit

Contract Amount: $113,959

Owner: North Perry Avenue Water District

Engineer: URS Greiner

Project Start: July 13th, 1998

Project Completion: 165 Calendar Days

Job Description: Installation of 8″ DI force main, drainage weir, CMU block building and associated pipe & appurtenances.